logo gestiondeprojet.com le site de la gestion de projet 
Bienvenu(e)! Identification Créer un nouveau profil

Recherche avancée

Adidas Superstar Sale

Envoyé par Danne243 
Adidas Superstar Sale
jeudi 23 décembre 2021 10:15:52
Adidas Superstar Sale


Take two pairs of classic kicks, dress them in patent leather and 3M and what do you get? The latest drop from adidas Originals, that’s what. The shell-toed Adidas Superstar Men and the Stan Smith 2 are featured in this twosome, which makes use of Shale Grey patent leather for the uppers. White midsoles, liners and for the Adidas Superstar UK, shell toes, are employed, as well. 3M detailing, which can add life to the most any sneaker, is used strategically on both shoes. These kicks may be grey, but they’re anything but subtle.

Fit for a king (of rock), the adidas Superstar is a classic among classics. The updated Adidas Superstar Women is no different and is now available in this new colorway perfect for royalty. Sporting the official color of kings and queens on its stripes, laces and back tab, this adidas Originals sneaker is a great example of simple perfection. The matte leather upper is complemented by a semi-gloss midfoot that adds depth to the overall look. Aluminum details appear throughout and a white sole sits below.

The year of the Adidas Superstar Salegets another contribution with this exotic makeover just for the ladies. The women’s adidas Originals Superstar 80s gets both a metal shelltoe and pony hair upper, also detailed with reptile-textured leather for a unique and stylish look that adds to the year-long celebration of the iconic low-top hoops shoe. Female Superstar aficionados can pick these up now from select adidas Originals retailers like Oneness.
Seuls les utilisateurs enregistrés peuvent poster des messages dans ce forum.

Cliquez ici pour vous connecter

gestiondeprojet.com | Logiciels | Liens | Forums | Sondages | Livres | Guides


Copyright 1999-2014 gestiondeprojet.com Tous droits réservés.