{"name":"gestiondeprojet.com","description":"Le blog de la gestion de projet","url":"http:\/\/www.gestiondeprojet.com\/blog","home":"http:\/\/www.gestiondeprojet.com\/blog","gmt_offset":"2","timezone_string":"","namespaces":["oembed\/1.0","akismet\/v1","jetpack\/v4","wpcom\/v2","wp\/v2"],"authentication":[],"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/"}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"oembed\/1.0"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/oembed\/1.0"}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true},"format":{"required":false,"default":"json"},"maxwidth":{"required":false,"default":600}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/oembed\/1.0\/embed"}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true,"description":"L\u2019URL de la ressource \u00e0 parcourir pour obtenir les donn\u00e9es oEmbed.","type":"string"},"format":{"required":false,"default":"json","enum":["json","xml"],"description":"Le format oEmbed \u00e0 utiliser.","type":"string"},"maxwidth":{"required":false,"default":600,"description":"La largeur maximale du contenu embarqu\u00e9 en pixels.","type":"integer"},"maxheight":{"required":false,"description":"La hauteur maximale du contenu embarqu\u00e9 oEmbed en pixels.","type":"integer"},"discover":{"required":false,"default":true,"description":"D\u00e9fini s\u2019il faut ou non effectuer une requ\u00eate de d\u00e9couverte oEmbed d\u2019autres fournisseurs non-inscrits sur la liste des fournisseurs autoris\u00e9s.","type":"boolean"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/oembed\/1.0\/proxy"}},"\/akismet\/v1":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"akismet\/v1"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/akismet\/v1"}},"\/akismet\/v1\/key":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"key":{"required":true,"description":"Une cl\u00e9 API Akismet de 12 caract\u00e8res. Disponible sur akismet.com\/get\/","type":"string"}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/akismet\/v1\/key"}},"\/akismet\/v1\/settings":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"akismet_strictness":{"required":false,"description":"Si oui, Akismet rejettera automatiquement les pires ind\u00e9sirables plut\u00f4t que de les placer dans le dossier des ind\u00e9sirables.","type":"boolean"},"akismet_show_user_comments_approved":{"required":false,"description":"Si oui, affiche le nombre de commentaires approuv\u00e9s \u00e0 c\u00f4t\u00e9 de chaque auteur de commentaire dans la page de liste de commentaires.","type":"boolean"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/akismet\/v1\/settings"}},"\/akismet\/v1\/stats":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"interval":{"required":false,"default":"all","description":"La p\u00e9riode sur laquelle les statistiques sont conserv\u00e9es. Options\u00a0: 60 jours, 6 mois, tous","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/akismet\/v1\/stats"}},"\/akismet\/v1\/stats\/(?P<interval>[\\w+])":{"namespace":"akismet\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"interval":{"required":false,"description":"La p\u00e9riode sur laquelle les statistiques sont conserv\u00e9es. Options\u00a0: 60 jours, 6 mois, tous","type":"string"}}}]},"\/akismet\/v1\/alert":{"namespace":"akismet\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"key":{"required":false,"description":"Une cl\u00e9 API Akismet de 12 caract\u00e8res. Disponible sur akismet.com\/get\/","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"key":{"required":false,"description":"Une cl\u00e9 API Akismet de 12 caract\u00e8res. Disponible sur akismet.com\/get\/","type":"string"}}},{"methods":["DELETE"],"args":{"key":{"required":false,"description":"Une cl\u00e9 API Akismet de 12 caract\u00e8res. Disponible sur akismet.com\/get\/","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/akismet\/v1\/alert"}},"\/jetpack\/v4":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"jetpack\/v4"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4"}},"\/jetpack\/v4\/plans":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/plans"}},"\/jetpack\/v4\/jitm":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/jitm"}},"\/jetpack\/v4\/verify_registration":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/verify_registration"}},"\/jetpack\/v4\/remote_authorize":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/remote_authorize"}},"\/jetpack\/v4\/connection":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection"}},"\/jetpack\/v4\/connection\/test":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection\/test"}},"\/jetpack\/v4\/connection\/test-wpcom":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection\/test-wpcom"}},"\/jetpack\/v4\/rewind":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/rewind"}},"\/jetpack\/v4\/connection\/url":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection\/url"}},"\/jetpack\/v4\/connection\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection\/data"}},"\/jetpack\/v4\/connection\/owner":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection\/owner"}},"\/jetpack\/v4\/tracking\/settings":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"tracks_opt_out":{"required":false,"type":"boolean"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/tracking\/settings"}},"\/jetpack\/v4\/connection\/user":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/connection\/user"}},"\/jetpack\/v4\/site":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/site"}},"\/jetpack\/v4\/site\/features":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/site\/features"}},"\/jetpack\/v4\/identity-crisis\/confirm-safe-mode":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/identity-crisis\/confirm-safe-mode"}},"\/jetpack\/v4\/identity-crisis\/start-fresh":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/identity-crisis\/start-fresh"}},"\/jetpack\/v4\/identity-crisis\/migrate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/identity-crisis\/migrate"}},"\/jetpack\/v4\/module\/all":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/module\/all"}},"\/jetpack\/v4\/module\/all\/active":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"modules":{"required":true,"default":"","type":"array","items":{"type":"string"}},"active":{"required":false,"default":true,"type":"boolean"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/module\/all\/active"}},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"context":{"required":false,"default":"edit"},"carousel_background_color":{"required":false,"default":"black","enum":["black","white"],"description":"Jeu de couleurs.","type":"string"},"carousel_display_exif":{"required":false,"default":0,"description":"Afficher les m\u00e9tadonn\u00e9es de vos photos (<a href=\"http:\/\/fr.wikipedia.org\/wiki\/Exchangeable_image_file_format\" target=\"_blank\">Exif<\/a>) dans le carrousel, lorsqu&rsquo;elles sont disponibles.","type":"boolean"},"highlander_comment_form_prompt":{"required":false,"default":"Laisser un commentaire","description":"Texte d&rsquo;accueil","type":"string"},"jetpack_comment_form_color_scheme":{"required":false,"default":"light","enum":["light","dark","transparent"],"description":"Jeu de couleurs","type":"string"},"jetpack_portfolio":{"required":false,"default":0,"description":"Activer ou d\u00e9sactiver le type d&#039;article Portfolio Jetpack.","type":"boolean"},"jetpack_portfolio_posts_per_page":{"required":false,"default":10,"description":"Nombre d&#039;entr\u00e9es maximum \u00e0 afficher sur les pages Portfolio.","type":"integer"},"jetpack_testimonial":{"required":false,"default":0,"description":"Activer ou d\u00e9sactiver le type d&#039;article T\u00e9moignages Jetpack.","type":"boolean"},"jetpack_testimonial_posts_per_page":{"required":false,"default":10,"description":"Nombre d&#039;entr\u00e9es maximum \u00e0 afficher sur les pages T\u00e9moignages.","type":"integer"},"tiled_galleries":{"required":false,"default":0,"description":"Affichez vos galeries dans une mosa\u00efque d&rsquo;images.","type":"boolean"},"gravatar_disable_hovercards":{"required":false,"default":"enabled","enum":["enabled","disabled"],"description":"Afficher le profil des utilisateurs au survol des Gravatars","type":"string"},"infinite_scroll":{"required":false,"default":1,"description":"Vers l&#039;infini et au-del\u00e0","type":"boolean"},"infinite_scroll_google_analytics":{"required":false,"default":0,"description":"Utiliser Google Analytics avec le D\u00e9filement en continu","type":"boolean"},"wpl_default":{"required":false,"default":"on","enum":["on","off"],"description":"Les Likes de WordPress.com sont","type":"string"},"social_notifications_like":{"required":false,"default":1,"description":"Envoyer une notification par e-mail lorsque quelqu\u2019un aime un article","type":"boolean"},"wpcom_publish_comments_with_markdown":{"required":false,"default":0,"description":"Utiliser Markdown pour les commentaires.","type":"boolean"},"wpcom_publish_posts_with_markdown":{"required":false,"default":0,"description":"Utiliser Markdown pour vos articles.","type":"boolean"},"wp_mobile_excerpt":{"required":false,"default":0,"description":"Extraits","type":"boolean"},"wp_mobile_featured_images":{"required":false,"default":0,"description":"Images \u00e0 la Une","type":"boolean"},"wp_mobile_app_promos":{"required":false,"default":0,"description":"Afficher un message de promotion des applications WordPress pour mobile au bas de votre th\u00e8me pour mobile.","type":"boolean"},"monitor_receive_notifications":{"required":false,"default":0,"description":"Recevoir des e-mails d&rsquo;alerte de Jetpack Monitor.","type":"boolean"},"post_by_email_address":{"required":false,"default":"noop","enum":["noop","create","regenerate","delete"],"description":"Adresse e-mail","type":"string"},"jetpack_protect_key":{"required":false,"default":"","description":"Prot\u00e9ger la cl\u00e9 API","type":"string"},"jetpack_protect_global_whitelist":{"required":false,"default":"","description":"Prot\u00e9ger la liste blanche mondiale","type":"string"},"sharing_services":{"required":false,"default":{"visible":["twitter","facebook","google-plus-1"],"hidden":[]},"description":"Services activ\u00e9s ainsi que ceux rassembl\u00e9s sous un bouton","type":"object"},"button_style":{"required":false,"default":"icon","enum":["icon-text","icon","text","official"],"description":"Style de bouton","type":"string"},"sharing_label":{"required":false,"default":"","description":"Libell\u00e9 du bouton","type":"string"},"show":{"required":false,"default":["post"],"description":"Vues o\u00f9 les boutons sont affich\u00e9s","type":"array","items":{"type":"string"}},"jetpack-twitter-cards-site-tag":{"required":false,"default":"","description":"Identifiant Twitter du propri\u00e9taire de ce site.","type":"string"},"sharedaddy_disable_resources":{"required":false,"default":0,"description":"D\u00e9sactiver CSS et JS","type":"boolean"},"custom":{"required":false,"default":{"sharing_name":"","sharing_url":"","sharing_icon":""},"description":"Services de partage personnalis\u00e9s ajout\u00e9s par l&#039;utilisateur.","type":"object"},"sharing_delete_service":{"required":false,"default":"","description":"Supprimez le service de partage personnalis\u00e9.","type":"string"},"jetpack_sso_require_two_step":{"required":false,"default":0,"description":"Exiger l&rsquo;authentification \u00e0 deux facteurs","type":"boolean"},"jetpack_sso_match_by_email":{"required":false,"default":0,"description":"Associer par e-mail","type":"boolean"},"stb_enabled":{"required":false,"default":1,"description":"Ajouter la locution &lt;em&gt;&#039;Suivre le Blog&#039;&lt;\/em&gt; au module des commentaires.","type":"boolean"},"stc_enabled":{"required":false,"default":1,"description":"Ajouter l&rsquo;option &lt;em&gt;&#039;S&rsquo;abonner aux commentaires&#039;&lt;\/em&gt; au formulaire de commentaires","type":"boolean"},"show_headline":{"required":false,"default":1,"description":"Mettre en valeur le contenu similaire avec un en-t\u00eate","type":"boolean"},"show_thumbnails":{"required":false,"default":0,"description":"Affichez une image miniature lorsque cela est possible","type":"boolean"},"onpublish":{"required":false,"default":0,"description":"Correction \u00e0 chaque nouvelle publication.","type":"boolean"},"onupdate":{"required":false,"default":0,"description":"Correction \u00e0 chaque nouvelle mise \u00e0 jour.","type":"boolean"},"Bias Language":{"required":false,"default":0,"description":"Langage Figur\u00e9","type":"boolean"},"Cliches":{"required":false,"default":0,"description":"Lieux communs","type":"boolean"},"Complex Expression":{"required":false,"default":0,"description":"Phrases complexes","type":"boolean"},"Diacritical Marks":{"required":false,"default":0,"description":"Signes diacritiques","type":"boolean"},"Double Negative":{"required":false,"default":0,"description":"Doubles n\u00e9gations","type":"boolean"},"Hidden Verbs":{"required":false,"default":0,"description":"Verbes cach\u00e9s","type":"boolean"},"Jargon Language":{"required":false,"default":0,"description":"Jargon","type":"boolean"},"Passive voice":{"required":false,"default":0,"description":"Voix passive","type":"boolean"},"Phrases to Avoid":{"required":false,"default":0,"description":"Phrases \u00e0 \u00e9viter","type":"boolean"},"Redundant Expression":{"required":false,"default":0,"description":"Phrases redondantes","type":"boolean"},"guess_lang":{"required":false,"default":0,"description":"Utiliser la d\u00e9tection automatique de la langue pour corriger le contenu.","type":"boolean"},"ignored_phrases":{"required":false,"default":"","description":"Ajouter une phrase \u00e0 ignorer","type":"string"},"unignore_phrase":{"required":false,"default":"","description":"Supprimer une phrase \u00e0 ignorer","type":"string"},"google":{"required":false,"default":"","description":"Google Search Console","type":"string"},"bing":{"required":false,"default":"","description":"Bing Webmaster Center","type":"string"},"pinterest":{"required":false,"default":"","description":"Pinterest Site Verification","type":"string"},"yandex":{"required":false,"default":"","description":"V\u00e9rification de site Yandex","type":"string"},"enable_header_ad":{"required":false,"default":1,"description":"Affichez une publicit\u00e9 en haut de chaque page.","type":"boolean"},"wordads_approved":{"required":false,"default":0,"description":"Le site est-il approuv\u00e9 pour WordAds&nbsp;?","type":"boolean"},"wordads_second_belowpost":{"required":false,"default":1,"description":"Afficher une seconde publicit\u00e9 sous l\u2019article&nbsp;?","type":"boolean"},"wordads_display_front_page":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur la page d\u2019accueil&nbsp;?","type":"boolean"},"wordads_display_post":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur les articles&nbsp;?","type":"boolean"},"wordads_display_page":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur les pages&nbsp;?","type":"boolean"},"wordads_display_archive":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur les pages d\u2019archives&nbsp;?","type":"boolean"},"wordads_custom_adstxt":{"required":false,"default":"","description":"Custom ads.txt entries","type":"string"},"google_analytics_tracking_id":{"required":false,"default":"","description":"Google Analytics","type":"string"},"admin_bar":{"required":false,"default":1,"description":"Ins\u00e9rer un graphique dans la barre d&rsquo;administration,  affichant le nombre de pages vues pendant les derni\u00e8res 48 heures.","type":"boolean"},"roles":{"required":false,"default":["administrator"],"description":"S\u00e9lectionner les r\u00f4les qui ont la capacit\u00e9 de voir les rapports statistiques.","type":"array","items":{"type":"string"}},"count_roles":{"required":false,"default":["administrator"],"description":"Compter les pages vues par les utilisateurs enregistr\u00e9s et connect\u00e9s.","type":"array","items":{"type":"string"}},"blog_id":{"required":false,"default":0,"description":"ID du blog.","type":"boolean"},"do_not_track":{"required":false,"default":1,"description":"Ne pas suivre.","type":"boolean"},"hide_smile":{"required":false,"default":1,"description":"Cacher l&#8217;image de Smiley ajout\u00e9e par les stats.","type":"boolean"},"version":{"required":false,"default":9,"description":"Version.","type":"integer"},"akismet_show_user_comments_approved":{"required":false,"default":0,"description":"","type":"boolean"},"wordpress_api_key":{"required":false,"default":"","description":"","type":"string"},"dismiss_dash_app_card":{"required":false,"default":0,"description":"","type":"boolean"},"dismiss_empty_stats_card":{"required":false,"default":0,"description":"","type":"boolean"},"lang_id":{"required":false,"default":"en_US","description":"Langue principale du site.","type":"string"},"onboarding":{"required":false,"default":{"siteTitle":"","siteDescription":"","siteType":"personal","homepageFormat":"posts","addContactForm":0,"businessAddress":{"name":"","street":"","city":"","state":"","zip":""},"installWooCommerce":false},"description":"","type":"object"},"show_welcome_for_new_plan":{"required":false,"default":0,"description":"","type":"boolean"},"after-the-deadline":{"required":false,"default":0,"description":"","type":"boolean"},"carousel":{"required":false,"default":0,"description":"","type":"boolean"},"comment-likes":{"required":false,"default":0,"description":"","type":"boolean"},"comments":{"required":false,"default":0,"description":"","type":"boolean"},"contact-form":{"required":false,"default":0,"description":"","type":"boolean"},"copy-post":{"required":false,"default":0,"description":"","type":"boolean"},"custom-content-types":{"required":false,"default":0,"description":"","type":"boolean"},"custom-css":{"required":false,"default":0,"description":"","type":"boolean"},"enhanced-distribution":{"required":false,"default":0,"description":"","type":"boolean"},"google-analytics":{"required":false,"default":0,"description":"","type":"boolean"},"gravatar-hovercards":{"required":false,"default":0,"description":"","type":"boolean"},"infinite-scroll":{"required":false,"default":0,"description":"","type":"boolean"},"json-api":{"required":false,"default":0,"description":"","type":"boolean"},"latex":{"required":false,"default":0,"description":"","type":"boolean"},"lazy-images":{"required":false,"default":0,"description":"","type":"boolean"},"likes":{"required":false,"default":0,"description":"","type":"boolean"},"manage":{"required":false,"default":0,"description":"","type":"boolean"},"markdown":{"required":false,"default":0,"description":"","type":"boolean"},"masterbar":{"required":false,"default":0,"description":"","type":"boolean"},"minileven":{"required":false,"default":0,"description":"","type":"boolean"},"monitor":{"required":false,"default":0,"description":"","type":"boolean"},"notes":{"required":false,"default":0,"description":"","type":"boolean"},"photon-cdn":{"required":false,"default":0,"description":"","type":"boolean"},"photon":{"required":false,"default":0,"description":"","type":"boolean"},"post-by-email":{"required":false,"default":0,"description":"","type":"boolean"},"protect":{"required":false,"default":0,"description":"","type":"boolean"},"publicize":{"required":false,"default":0,"description":"","type":"boolean"},"pwa":{"required":false,"default":0,"description":"","type":"boolean"},"related-posts":{"required":false,"default":0,"description":"","type":"boolean"},"search":{"required":false,"default":0,"description":"","type":"boolean"},"seo-tools":{"required":false,"default":0,"description":"","type":"boolean"},"sharedaddy":{"required":false,"default":0,"description":"","type":"boolean"},"shortcodes":{"required":false,"default":0,"description":"","type":"boolean"},"shortlinks":{"required":false,"default":0,"description":"","type":"boolean"},"sitemaps":{"required":false,"default":0,"description":"","type":"boolean"},"sso":{"required":false,"default":0,"description":"","type":"boolean"},"stats":{"required":false,"default":0,"description":"","type":"boolean"},"subscriptions":{"required":false,"default":0,"description":"","type":"boolean"},"tiled-gallery":{"required":false,"default":0,"description":"","type":"boolean"},"vaultpress":{"required":false,"default":0,"description":"","type":"boolean"},"verification-tools":{"required":false,"default":0,"description":"","type":"boolean"},"videopress":{"required":false,"default":0,"description":"","type":"boolean"},"widget-visibility":{"required":false,"default":0,"description":"","type":"boolean"},"widgets":{"required":false,"default":0,"description":"","type":"boolean"},"wordads":{"required":false,"default":0,"description":"","type":"boolean"}}}]},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)\/active":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"active":{"required":true,"default":true,"type":"boolean"}}}]},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"range":{"required":false,"default":"day","type":"string"}}}]},"\/jetpack\/v4\/module\/(?P<service>[a-z\\-]+)\/key\/check":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"api_key":{"required":false,"default":"","type":"string"}}}]},"\/jetpack\/v4\/settings":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"context":{"required":false,"default":"edit"},"carousel_background_color":{"required":false,"default":"black","enum":["black","white"],"description":"Jeu de couleurs.","type":"string"},"carousel_display_exif":{"required":false,"default":0,"description":"Afficher les m\u00e9tadonn\u00e9es de vos photos (<a href=\"http:\/\/fr.wikipedia.org\/wiki\/Exchangeable_image_file_format\" target=\"_blank\">Exif<\/a>) dans le carrousel, lorsqu&rsquo;elles sont disponibles.","type":"boolean"},"highlander_comment_form_prompt":{"required":false,"default":"Laisser un commentaire","description":"Texte d&rsquo;accueil","type":"string"},"jetpack_comment_form_color_scheme":{"required":false,"default":"light","enum":["light","dark","transparent"],"description":"Jeu de couleurs","type":"string"},"jetpack_portfolio":{"required":false,"default":0,"description":"Activer ou d\u00e9sactiver le type d&#039;article Portfolio Jetpack.","type":"boolean"},"jetpack_portfolio_posts_per_page":{"required":false,"default":10,"description":"Nombre d&#039;entr\u00e9es maximum \u00e0 afficher sur les pages Portfolio.","type":"integer"},"jetpack_testimonial":{"required":false,"default":0,"description":"Activer ou d\u00e9sactiver le type d&#039;article T\u00e9moignages Jetpack.","type":"boolean"},"jetpack_testimonial_posts_per_page":{"required":false,"default":10,"description":"Nombre d&#039;entr\u00e9es maximum \u00e0 afficher sur les pages T\u00e9moignages.","type":"integer"},"tiled_galleries":{"required":false,"default":0,"description":"Affichez vos galeries dans une mosa\u00efque d&rsquo;images.","type":"boolean"},"gravatar_disable_hovercards":{"required":false,"default":"enabled","enum":["enabled","disabled"],"description":"Afficher le profil des utilisateurs au survol des Gravatars","type":"string"},"infinite_scroll":{"required":false,"default":1,"description":"Vers l&#039;infini et au-del\u00e0","type":"boolean"},"infinite_scroll_google_analytics":{"required":false,"default":0,"description":"Utiliser Google Analytics avec le D\u00e9filement en continu","type":"boolean"},"wpl_default":{"required":false,"default":"on","enum":["on","off"],"description":"Les Likes de WordPress.com sont","type":"string"},"social_notifications_like":{"required":false,"default":1,"description":"Envoyer une notification par e-mail lorsque quelqu\u2019un aime un article","type":"boolean"},"wpcom_publish_comments_with_markdown":{"required":false,"default":0,"description":"Utiliser Markdown pour les commentaires.","type":"boolean"},"wpcom_publish_posts_with_markdown":{"required":false,"default":0,"description":"Utiliser Markdown pour vos articles.","type":"boolean"},"wp_mobile_excerpt":{"required":false,"default":0,"description":"Extraits","type":"boolean"},"wp_mobile_featured_images":{"required":false,"default":0,"description":"Images \u00e0 la Une","type":"boolean"},"wp_mobile_app_promos":{"required":false,"default":0,"description":"Afficher un message de promotion des applications WordPress pour mobile au bas de votre th\u00e8me pour mobile.","type":"boolean"},"monitor_receive_notifications":{"required":false,"default":0,"description":"Recevoir des e-mails d&rsquo;alerte de Jetpack Monitor.","type":"boolean"},"post_by_email_address":{"required":false,"default":"noop","enum":["noop","create","regenerate","delete"],"description":"Adresse e-mail","type":"string"},"jetpack_protect_key":{"required":false,"default":"","description":"Prot\u00e9ger la cl\u00e9 API","type":"string"},"jetpack_protect_global_whitelist":{"required":false,"default":"","description":"Prot\u00e9ger la liste blanche mondiale","type":"string"},"sharing_services":{"required":false,"default":{"visible":["twitter","facebook","google-plus-1"],"hidden":[]},"description":"Services activ\u00e9s ainsi que ceux rassembl\u00e9s sous un bouton","type":"object"},"button_style":{"required":false,"default":"icon","enum":["icon-text","icon","text","official"],"description":"Style de bouton","type":"string"},"sharing_label":{"required":false,"default":"","description":"Libell\u00e9 du bouton","type":"string"},"show":{"required":false,"default":["post"],"description":"Vues o\u00f9 les boutons sont affich\u00e9s","type":"array","items":{"type":"string"}},"jetpack-twitter-cards-site-tag":{"required":false,"default":"","description":"Identifiant Twitter du propri\u00e9taire de ce site.","type":"string"},"sharedaddy_disable_resources":{"required":false,"default":0,"description":"D\u00e9sactiver CSS et JS","type":"boolean"},"custom":{"required":false,"default":{"sharing_name":"","sharing_url":"","sharing_icon":""},"description":"Services de partage personnalis\u00e9s ajout\u00e9s par l&#039;utilisateur.","type":"object"},"sharing_delete_service":{"required":false,"default":"","description":"Supprimez le service de partage personnalis\u00e9.","type":"string"},"jetpack_sso_require_two_step":{"required":false,"default":0,"description":"Exiger l&rsquo;authentification \u00e0 deux facteurs","type":"boolean"},"jetpack_sso_match_by_email":{"required":false,"default":0,"description":"Associer par e-mail","type":"boolean"},"stb_enabled":{"required":false,"default":1,"description":"Ajouter la locution &lt;em&gt;&#039;Suivre le Blog&#039;&lt;\/em&gt; au module des commentaires.","type":"boolean"},"stc_enabled":{"required":false,"default":1,"description":"Ajouter l&rsquo;option &lt;em&gt;&#039;S&rsquo;abonner aux commentaires&#039;&lt;\/em&gt; au formulaire de commentaires","type":"boolean"},"show_headline":{"required":false,"default":1,"description":"Mettre en valeur le contenu similaire avec un en-t\u00eate","type":"boolean"},"show_thumbnails":{"required":false,"default":0,"description":"Affichez une image miniature lorsque cela est possible","type":"boolean"},"onpublish":{"required":false,"default":0,"description":"Correction \u00e0 chaque nouvelle publication.","type":"boolean"},"onupdate":{"required":false,"default":0,"description":"Correction \u00e0 chaque nouvelle mise \u00e0 jour.","type":"boolean"},"Bias Language":{"required":false,"default":0,"description":"Langage Figur\u00e9","type":"boolean"},"Cliches":{"required":false,"default":0,"description":"Lieux communs","type":"boolean"},"Complex Expression":{"required":false,"default":0,"description":"Phrases complexes","type":"boolean"},"Diacritical Marks":{"required":false,"default":0,"description":"Signes diacritiques","type":"boolean"},"Double Negative":{"required":false,"default":0,"description":"Doubles n\u00e9gations","type":"boolean"},"Hidden Verbs":{"required":false,"default":0,"description":"Verbes cach\u00e9s","type":"boolean"},"Jargon Language":{"required":false,"default":0,"description":"Jargon","type":"boolean"},"Passive voice":{"required":false,"default":0,"description":"Voix passive","type":"boolean"},"Phrases to Avoid":{"required":false,"default":0,"description":"Phrases \u00e0 \u00e9viter","type":"boolean"},"Redundant Expression":{"required":false,"default":0,"description":"Phrases redondantes","type":"boolean"},"guess_lang":{"required":false,"default":0,"description":"Utiliser la d\u00e9tection automatique de la langue pour corriger le contenu.","type":"boolean"},"ignored_phrases":{"required":false,"default":"","description":"Ajouter une phrase \u00e0 ignorer","type":"string"},"unignore_phrase":{"required":false,"default":"","description":"Supprimer une phrase \u00e0 ignorer","type":"string"},"google":{"required":false,"default":"","description":"Google Search Console","type":"string"},"bing":{"required":false,"default":"","description":"Bing Webmaster Center","type":"string"},"pinterest":{"required":false,"default":"","description":"Pinterest Site Verification","type":"string"},"yandex":{"required":false,"default":"","description":"V\u00e9rification de site Yandex","type":"string"},"enable_header_ad":{"required":false,"default":1,"description":"Affichez une publicit\u00e9 en haut de chaque page.","type":"boolean"},"wordads_approved":{"required":false,"default":0,"description":"Le site est-il approuv\u00e9 pour WordAds&nbsp;?","type":"boolean"},"wordads_second_belowpost":{"required":false,"default":1,"description":"Afficher une seconde publicit\u00e9 sous l\u2019article&nbsp;?","type":"boolean"},"wordads_display_front_page":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur la page d\u2019accueil&nbsp;?","type":"boolean"},"wordads_display_post":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur les articles&nbsp;?","type":"boolean"},"wordads_display_page":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur les pages&nbsp;?","type":"boolean"},"wordads_display_archive":{"required":false,"default":1,"description":"Afficher des publicit\u00e9s sur les pages d\u2019archives&nbsp;?","type":"boolean"},"wordads_custom_adstxt":{"required":false,"default":"","description":"Custom ads.txt entries","type":"string"},"google_analytics_tracking_id":{"required":false,"default":"","description":"Google Analytics","type":"string"},"admin_bar":{"required":false,"default":1,"description":"Ins\u00e9rer un graphique dans la barre d&rsquo;administration,  affichant le nombre de pages vues pendant les derni\u00e8res 48 heures.","type":"boolean"},"roles":{"required":false,"default":["administrator"],"description":"S\u00e9lectionner les r\u00f4les qui ont la capacit\u00e9 de voir les rapports statistiques.","type":"array","items":{"type":"string"}},"count_roles":{"required":false,"default":["administrator"],"description":"Compter les pages vues par les utilisateurs enregistr\u00e9s et connect\u00e9s.","type":"array","items":{"type":"string"}},"blog_id":{"required":false,"default":0,"description":"ID du blog.","type":"boolean"},"do_not_track":{"required":false,"default":1,"description":"Ne pas suivre.","type":"boolean"},"hide_smile":{"required":false,"default":1,"description":"Cacher l&#8217;image de Smiley ajout\u00e9e par les stats.","type":"boolean"},"version":{"required":false,"default":9,"description":"Version.","type":"integer"},"akismet_show_user_comments_approved":{"required":false,"default":0,"description":"","type":"boolean"},"wordpress_api_key":{"required":false,"default":"","description":"","type":"string"},"dismiss_dash_app_card":{"required":false,"default":0,"description":"","type":"boolean"},"dismiss_empty_stats_card":{"required":false,"default":0,"description":"","type":"boolean"},"lang_id":{"required":false,"default":"en_US","description":"Langue principale du site.","type":"string"},"onboarding":{"required":false,"default":{"siteTitle":"","siteDescription":"","siteType":"personal","homepageFormat":"posts","addContactForm":0,"businessAddress":{"name":"","street":"","city":"","state":"","zip":""},"installWooCommerce":false},"description":"","type":"object"},"show_welcome_for_new_plan":{"required":false,"default":0,"description":"","type":"boolean"},"after-the-deadline":{"required":false,"default":0,"description":"","type":"boolean"},"carousel":{"required":false,"default":0,"description":"","type":"boolean"},"comment-likes":{"required":false,"default":0,"description":"","type":"boolean"},"comments":{"required":false,"default":0,"description":"","type":"boolean"},"contact-form":{"required":false,"default":0,"description":"","type":"boolean"},"copy-post":{"required":false,"default":0,"description":"","type":"boolean"},"custom-content-types":{"required":false,"default":0,"description":"","type":"boolean"},"custom-css":{"required":false,"default":0,"description":"","type":"boolean"},"enhanced-distribution":{"required":false,"default":0,"description":"","type":"boolean"},"google-analytics":{"required":false,"default":0,"description":"","type":"boolean"},"gravatar-hovercards":{"required":false,"default":0,"description":"","type":"boolean"},"infinite-scroll":{"required":false,"default":0,"description":"","type":"boolean"},"json-api":{"required":false,"default":0,"description":"","type":"boolean"},"latex":{"required":false,"default":0,"description":"","type":"boolean"},"lazy-images":{"required":false,"default":0,"description":"","type":"boolean"},"likes":{"required":false,"default":0,"description":"","type":"boolean"},"manage":{"required":false,"default":0,"description":"","type":"boolean"},"markdown":{"required":false,"default":0,"description":"","type":"boolean"},"masterbar":{"required":false,"default":0,"description":"","type":"boolean"},"minileven":{"required":false,"default":0,"description":"","type":"boolean"},"monitor":{"required":false,"default":0,"description":"","type":"boolean"},"notes":{"required":false,"default":0,"description":"","type":"boolean"},"photon-cdn":{"required":false,"default":0,"description":"","type":"boolean"},"photon":{"required":false,"default":0,"description":"","type":"boolean"},"post-by-email":{"required":false,"default":0,"description":"","type":"boolean"},"protect":{"required":false,"default":0,"description":"","type":"boolean"},"publicize":{"required":false,"default":0,"description":"","type":"boolean"},"pwa":{"required":false,"default":0,"description":"","type":"boolean"},"related-posts":{"required":false,"default":0,"description":"","type":"boolean"},"search":{"required":false,"default":0,"description":"","type":"boolean"},"seo-tools":{"required":false,"default":0,"description":"","type":"boolean"},"sharedaddy":{"required":false,"default":0,"description":"","type":"boolean"},"shortcodes":{"required":false,"default":0,"description":"","type":"boolean"},"shortlinks":{"required":false,"default":0,"description":"","type":"boolean"},"sitemaps":{"required":false,"default":0,"description":"","type":"boolean"},"sso":{"required":false,"default":0,"description":"","type":"boolean"},"stats":{"required":false,"default":0,"description":"","type":"boolean"},"subscriptions":{"required":false,"default":0,"description":"","type":"boolean"},"tiled-gallery":{"required":false,"default":0,"description":"","type":"boolean"},"vaultpress":{"required":false,"default":0,"description":"","type":"boolean"},"verification-tools":{"required":false,"default":0,"description":"","type":"boolean"},"videopress":{"required":false,"default":0,"description":"","type":"boolean"},"widget-visibility":{"required":false,"default":0,"description":"","type":"boolean"},"widgets":{"required":false,"default":0,"description":"","type":"boolean"},"wordads":{"required":false,"default":0,"description":"","type":"boolean"}}},{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/settings"}},"\/jetpack\/v4\/settings\/(?P<slug>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"context":{"required":false,"default":"edit"}}}]},"\/jetpack\/v4\/options\/(?P<options>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/jumpstart":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"active":{"required":true}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/jumpstart"}},"\/jetpack\/v4\/updates\/plugins":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/updates\/plugins"}},"\/jetpack\/v4\/notice\/(?P<notice>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/plugins":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/plugins"}},"\/jetpack\/v4\/plugin\/(?P<plugin>[a-z\\\/\\.\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/widgets\/(?P<id>[0-9a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/verify-site\/(?P<service>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"keyring_id":{"required":true,"type":"integer"}}}]},"\/jetpack\/v4\/verify-site\/(?P<service>[a-z\\-_]+)\/(?<keyring_id>[0-9]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/service-api-keys\/(?P<service>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"service_api_key":{"required":true,"type":"text"}}},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"wpcom\/v2"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2"}},"\/wpcom\/v2\/business-hours\/localized-week":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/business-hours\/localized-week"}},"\/wpcom\/v2\/mailchimp":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/mailchimp"}},"\/wpcom\/v2\/gutenberg\/available-extensions":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/gutenberg\/available-extensions"}},"\/wpcom\/v2\/hello":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/hello"}},"\/wpcom\/v2\/publicize\/connections":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/publicize\/connections"}},"\/wpcom\/v2\/publicize\/connection-test-results":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/publicize\/connection-test-results"}},"\/wpcom\/v2\/publicize\/services":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/publicize\/services"}},"\/wpcom\/v2\/service-api-keys\/(?P<service>[a-z\\-_]+)":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"service_api_key":{"required":true,"type":"text"}}},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2\/subscribers\/count":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wpcom\/v2\/subscribers\/count"}},"\/jetpack\/v4\/hints":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"hint":{"required":true,"default":"","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/jetpack\/v4\/hints"}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"wp\/v2"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2"}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"author":{"required":false,"default":[],"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","spam","any"],"type":"string"}},"categories":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie categories.","type":"array","items":{"type":"integer"}},"categories_exclude":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les \u00e9l\u00e9ments sauf ceux qui ont un terme sp\u00e9cifique assign\u00e9 \u00e0 la taxonomie categories.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie tags.","type":"array","items":{"type":"integer"}},"tags_exclude":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les \u00e9l\u00e9ments sauf ceux qui ont un terme sp\u00e9cifique assign\u00e9 \u00e0 la taxonomie tags.","type":"array","items":{"type":"integer"}},"sticky":{"required":false,"description":"Limiter les r\u00e9sultats aux \u00e9l\u00e9ments qui sont \u00e9pingl\u00e9s.","type":"boolean"}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"format":{"required":false,"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"description":"Le format pour l\u2019objet.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"sticky":{"required":false,"description":"D\u00e9finit si l\u2019objet doit \u00eatre trait\u00e9 en tant que contenu \u00e9pingl\u00e9 ou non.","type":"boolean"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"categories":{"required":false,"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie category.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie post_tag.","type":"array","items":{"type":"integer"}},"jetpack_publicize_connections":{"required":false,"default":[],"type":"array","items":{"$schema":"http:\/\/json-schema.org\/draft-04\/schema#","title":"jetpack-publicize-post-connection","type":"object","properties":{"id":{"description":"Unique identifier for the Publicize Connection","type":"string","context":["view","edit"],"readonly":true},"service_name":{"description":"Alphanumeric identifier for the Publicize Service","type":"string","context":["view","edit"],"readonly":true},"display_name":{"description":"Username of the connected account","type":"string","context":["view","edit"],"readonly":true},"enabled":{"description":"Whether to share to this connection","type":"boolean","context":["edit"]},"done":{"description":"Whether Publicize has already finished sharing for this post","type":"boolean","context":["edit"],"readonly":true},"toggleable":{"description":"Whether `enable` can be changed for this post\/connection","type":"boolean","context":["edit"],"readonly":true}}}},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/posts"}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"format":{"required":false,"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"description":"Le format pour l\u2019objet.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"sticky":{"required":false,"description":"D\u00e9finit si l\u2019objet doit \u00eatre trait\u00e9 en tant que contenu \u00e9pingl\u00e9 ou non.","type":"boolean"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"categories":{"required":false,"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie category.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie post_tag.","type":"array","items":{"type":"integer"}},"jetpack_publicize_connections":{"required":false,"type":"array","items":{"$schema":"http:\/\/json-schema.org\/draft-04\/schema#","title":"jetpack-publicize-post-connection","type":"object","properties":{"id":{"description":"Unique identifier for the Publicize Connection","type":"string","context":["view","edit"],"readonly":true},"service_name":{"description":"Alphanumeric identifier for the Publicize Service","type":"string","context":["view","edit"],"readonly":true},"display_name":{"description":"Username of the connected account","type":"string","context":["view","edit"],"readonly":true},"enabled":{"description":"Whether to share to this connection","type":"boolean","context":["edit"]},"done":{"description":"Whether Publicize has already finished sharing for this post","type":"boolean","context":["edit"],"readonly":true},"toggleable":{"description":"Whether `enable` can be changed for this post\/connection","type":"boolean","context":["edit"],"readonly":true}}}},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["DELETE"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"N\u00e9cessite la valeur \"true\", car les r\u00e9visions ne supportent pas la suppression forc\u00e9e. ","type":"boolean"}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"format":{"required":false,"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"description":"Le format pour l\u2019objet.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"sticky":{"required":false,"description":"D\u00e9finit si l\u2019objet doit \u00eatre trait\u00e9 en tant que contenu \u00e9pingl\u00e9 ou non.","type":"boolean"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"categories":{"required":false,"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie category.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie post_tag.","type":"array","items":{"type":"integer"}},"jetpack_publicize_connections":{"required":false,"type":"array","items":{"$schema":"http:\/\/json-schema.org\/draft-04\/schema#","title":"jetpack-publicize-post-connection","type":"object","properties":{"id":{"description":"Unique identifier for the Publicize Connection","type":"string","context":["view","edit"],"readonly":true},"service_name":{"description":"Alphanumeric identifier for the Publicize Service","type":"string","context":["view","edit"],"readonly":true},"display_name":{"description":"Username of the connected account","type":"string","context":["view","edit"],"readonly":true},"enabled":{"description":"Whether to share to this connection","type":"boolean","context":["edit"]},"done":{"description":"Whether Publicize has already finished sharing for this post","type":"boolean","context":["edit"],"readonly":true},"toggleable":{"description":"Whether `enable` can be changed for this post\/connection","type":"boolean","context":["edit"],"readonly":true}}}},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"L\u2019ID pour l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"author":{"required":false,"default":[],"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"menu_order":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant une valeur menu_order sp\u00e9cifique.","type":"integer"},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"parent":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments ayant un ID parent particulier.","type":"array","items":{"type":"integer"}},"parent_exclude":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les r\u00e9sultats, except\u00e9s ceux dont le parent porte un ID sp\u00e9cifique.","type":"array","items":{"type":"integer"}},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","spam","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"menu_order":{"required":false,"description":"L\u2019ordre de l\u2019objet en relation \u00e0 d\u2019autres objets du m\u00eame type.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/pages"}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"menu_order":{"required":false,"description":"L\u2019ordre de l\u2019objet en relation \u00e0 d\u2019autres objets du m\u00eame type.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["DELETE"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"N\u00e9cessite la valeur \"true\", car les r\u00e9visions ne supportent pas la suppression forc\u00e9e. ","type":"boolean"}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"menu_order":{"required":false,"description":"L\u2019ordre de l\u2019objet en relation \u00e0 d\u2019autres objets du m\u00eame type.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"L\u2019ID pour l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"author":{"required":false,"default":[],"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"parent":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments ayant un ID parent particulier.","type":"array","items":{"type":"integer"}},"parent_exclude":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les r\u00e9sultats, except\u00e9s ceux dont le parent porte un ID sp\u00e9cifique.","type":"array","items":{"type":"integer"}},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"inherit","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"}},"media_type":{"required":false,"enum":["image","video","text","application","audio"],"description":"Limiter le groupe de r\u00e9sultats aux m\u00e9dias attach\u00e9s d\u2019un type particulier.","type":"string"},"mime_type":{"required":false,"description":"Limiter le groupe de r\u00e9sultats \u00e0 un type MIME particulier.","type":"string"}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"},"alt_text":{"required":false,"description":"Texte alternatif propos\u00e9 si le fichier ne peut pas \u00eatre affich\u00e9.","type":"string"},"caption":{"required":false,"description":"La l\u00e9gende du fichier joint.","type":"object"},"description":{"required":false,"description":"La description du fichier joint.","type":"object"},"post":{"required":false,"description":"L\u2019ID pour la publication associ\u00e9e au fichier.","type":"integer"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/media"}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cet objet.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"},"jetpack_sharing_enabled":{"required":false,"description":"Are sharing buttons enabled?","type":"boolean"},"jetpack_likes_enabled":{"required":false,"description":"Are Likes enabled?","type":"boolean"},"alt_text":{"required":false,"description":"Texte alternatif propos\u00e9 si le fichier ne peut pas \u00eatre affich\u00e9.","type":"string"},"caption":{"required":false,"description":"La l\u00e9gende du fichier joint.","type":"object"},"description":{"required":false,"description":"La description du fichier joint.","type":"object"},"post":{"required":false,"description":"L\u2019ID pour la publication associ\u00e9e au fichier.","type":"integer"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","spam","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/blocks"}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"L\u2019ID pour l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/feedback":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","spam","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/feedback"}},"\/wp\/v2\/feedback\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/feedback\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}]},"\/wp\/v2\/feedback\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"L\u2019ID pour l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/jp_pay_order":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","spam","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/jp_pay_order"}},"\/wp\/v2\/jp_pay_order\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/jp_pay_order\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"excerpt":{"required":false,"description":"L\u2019extrait pour l\u2019objet.","type":"object"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}]},"\/wp\/v2\/jp_pay_order\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"L\u2019ID pour l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/jp_pay_product":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"author":{"required":false,"default":[],"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","spam","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/jp_pay_product"}},"\/wp\/v2\/jp_pay_product\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"}}}]},"\/wp\/v2\/jp_pay_product\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019objet unique de son type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private","spam"],"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string"},"password":{"required":false,"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string"},"title":{"required":false,"description":"Le titre pour l\u2019objet.","type":"object"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"author":{"required":false,"description":"L\u2019ID pour l\u2019auteur de l\u2019objet.","type":"integer"},"featured_media":{"required":false,"description":"L\u2019ID du m\u00e9dia mis en avant pour l\u2019objet.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"},"template":{"required":false,"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher l\u2019objet.","type":"string"}}}]},"\/wp\/v2\/jp_pay_product\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"id":{"required":false,"description":"L\u2019ID pour l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/types"}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour le type de publication.","type":"string"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/statuses"}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019\u00e9tat.","type":"string"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"type":{"required":false,"description":"Limiter les r\u00e9sultats aux taxonomies associ\u00e9es un type de publication sp\u00e9cifique.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/taxonomies"}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour la taxonomie.","type":"string"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"order":{"required":false,"default":"asc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"description":"Trier la collection par attributs de terme.","type":"string"},"hide_empty":{"required":false,"default":false,"description":"Pour masquer des termes non affect\u00e9es \u00e0 des publications ou non.","type":"boolean"},"parent":{"required":false,"description":"R\u00e9sultats limit\u00e9s aux termes ayant un parent sp\u00e9cifique.","type":"integer"},"post":{"required":false,"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"}}}},{"methods":["POST"],"args":{"description":{"required":false,"description":"Description HTML du terme.","type":"string"},"name":{"required":true,"description":"Titre HTML pour le terme.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string"},"parent":{"required":false,"description":"L\u2019ID du terme parent.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/categories"}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identificateur unique pour le terme.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identificateur unique pour le terme.","type":"integer"},"description":{"required":false,"description":"Description HTML du terme.","type":"string"},"name":{"required":false,"description":"Titre HTML pour le terme.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string"},"parent":{"required":false,"description":"L\u2019ID du terme parent.","type":"integer"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identificateur unique pour le terme.","type":"integer"},"force":{"required":false,"default":false,"description":"N\u00e9cessite la valeur \"true\", car les termes ne supportent pas la suppression forc\u00e9e. ","type":"boolean"}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"asc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"description":"Trier la collection par attributs de terme.","type":"string"},"hide_empty":{"required":false,"default":false,"description":"Pour masquer des termes non affect\u00e9es \u00e0 des publications ou non.","type":"boolean"},"post":{"required":false,"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"}}}},{"methods":["POST"],"args":{"description":{"required":false,"description":"Description HTML du terme.","type":"string"},"name":{"required":true,"description":"Titre HTML pour le terme.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/tags"}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identificateur unique pour le terme.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identificateur unique pour le terme.","type":"integer"},"description":{"required":false,"description":"Description HTML du terme.","type":"string"},"name":{"required":false,"description":"Titre HTML pour le terme.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identificateur unique pour le terme.","type":"integer"},"force":{"required":false,"default":false,"description":"N\u00e9cessite la valeur \"true\", car les termes ne supportent pas la suppression forc\u00e9e. ","type":"boolean"}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"asc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"name","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"slug":{"required":false,"description":"Limiter le jeu de r\u00e9sultats  aux utilisateurs ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"}},"roles":{"required":false,"description":"Limiter le r\u00e9sultat aux utilisateurs correspondants \u00e0 au moins un r\u00f4le sp\u00e9cifique fourni. Accepte les listes de type CSV ou les r\u00f4les uniques.","type":"array","items":{"type":"string"}},"who":{"required":false,"enum":["authors"],"description":"Limiter le jeu de r\u00e9sultats aux utilisateurs consid\u00e9r\u00e9s comme auteurs.","type":"string"}}},{"methods":["POST"],"args":{"username":{"required":true,"description":"Nom de connexion pour l\u2019utilisateur.","type":"string"},"name":{"required":false,"description":"Nom affich\u00e9 pour l\u2019utilisateur.","type":"string"},"first_name":{"required":false,"description":"Pr\u00e9nom de l\u2019utilisateur.","type":"string"},"last_name":{"required":false,"description":"Nom de l\u2019utilisateur.","type":"string"},"email":{"required":true,"description":"L\u2019adresse e-mail pour l\u2019utilisateur.","type":"string"},"url":{"required":false,"description":"URL de l\u2019utilisateur.","type":"string"},"description":{"required":false,"description":"Description de l\u2019utilisateur.","type":"string"},"locale":{"required":false,"enum":["","en_US","fr_FR"],"description":"Langue de l\u2019utilisateur.","type":"string"},"nickname":{"required":false,"description":"Le surnom de l\u2019utilisateur.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019utilisateur.","type":"string"},"roles":{"required":false,"description":"R\u00f4les assign\u00e9s \u00e0 l\u2019utilisateur.","type":"array","items":{"type":"string"}},"password":{"required":true,"description":"Mot de passe pour l\u2019utilisateur (jamais inclus).","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/users"}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identificateur unique pour l\u2019utilisateur.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identificateur unique pour l\u2019utilisateur.","type":"integer"},"username":{"required":false,"description":"Nom de connexion pour l\u2019utilisateur.","type":"string"},"name":{"required":false,"description":"Nom affich\u00e9 pour l\u2019utilisateur.","type":"string"},"first_name":{"required":false,"description":"Pr\u00e9nom de l\u2019utilisateur.","type":"string"},"last_name":{"required":false,"description":"Nom de l\u2019utilisateur.","type":"string"},"email":{"required":false,"description":"L\u2019adresse e-mail pour l\u2019utilisateur.","type":"string"},"url":{"required":false,"description":"URL de l\u2019utilisateur.","type":"string"},"description":{"required":false,"description":"Description de l\u2019utilisateur.","type":"string"},"locale":{"required":false,"enum":["","en_US","fr_FR"],"description":"Langue de l\u2019utilisateur.","type":"string"},"nickname":{"required":false,"description":"Le surnom de l\u2019utilisateur.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019utilisateur.","type":"string"},"roles":{"required":false,"description":"R\u00f4les assign\u00e9s \u00e0 l\u2019utilisateur.","type":"array","items":{"type":"string"}},"password":{"required":false,"description":"Mot de passe pour l\u2019utilisateur (jamais inclus).","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identificateur unique pour l\u2019utilisateur.","type":"integer"},"force":{"required":false,"default":false,"description":"N\u00e9cessite la valeur \"true\", car l\u2019utilisateur ne supporte pas la suppression forc\u00e9e.","type":"boolean"},"reassign":{"required":true,"description":"R\u00e9affectez les publications et les liens de l\u2019utilisateur supprim\u00e9 \u00e0 cet ID d\u2019utilisateur.","type":"integer"}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"required":false,"description":"Nom de connexion pour l\u2019utilisateur.","type":"string"},"name":{"required":false,"description":"Nom affich\u00e9 pour l\u2019utilisateur.","type":"string"},"first_name":{"required":false,"description":"Pr\u00e9nom de l\u2019utilisateur.","type":"string"},"last_name":{"required":false,"description":"Nom de l\u2019utilisateur.","type":"string"},"email":{"required":false,"description":"L\u2019adresse e-mail pour l\u2019utilisateur.","type":"string"},"url":{"required":false,"description":"URL de l\u2019utilisateur.","type":"string"},"description":{"required":false,"description":"Description de l\u2019utilisateur.","type":"string"},"locale":{"required":false,"enum":["","en_US","fr_FR"],"description":"Langue de l\u2019utilisateur.","type":"string"},"nickname":{"required":false,"description":"Le surnom de l\u2019utilisateur.","type":"string"},"slug":{"required":false,"description":"Un identificateur alphanum\u00e9rique pour l\u2019utilisateur.","type":"string"},"roles":{"required":false,"description":"R\u00f4les assign\u00e9s \u00e0 l\u2019utilisateur.","type":"array","items":{"type":"string"}},"password":{"required":false,"description":"Mot de passe pour l\u2019utilisateur (jamais inclus).","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}},{"methods":["DELETE"],"args":{"force":{"required":false,"default":false,"description":"N\u00e9cessite la valeur \"true\", car l\u2019utilisateur ne supporte pas la suppression forc\u00e9e.","type":"boolean"},"reassign":{"required":true,"description":"R\u00e9affectez les publications et les liens de l\u2019utilisateur supprim\u00e9 \u00e0 cet ID d\u2019utilisateur.","type":"integer"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/users\/me"}},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"after":{"required":false,"description":"Limiter les r\u00e9ponses aux commentaires publi\u00e9s apr\u00e8s une date donn\u00e9e et conforme ISO8601.","type":"string"},"author":{"required":false,"description":"Limiter le jeu de r\u00e9sultats aux commentaires assign\u00e9s aux ID utilisateurs sp\u00e9cifi\u00e9s. N\u00e9cessite des droits sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les commentaires assign\u00e9s aux ID utilisateurs sp\u00e9cifi\u00e9s. N\u00e9cessite des droits sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"author_email":{"required":false,"description":"Limiter le jeu de r\u00e9sultats \u00e0 une adresse email d\u2019auteur sp\u00e9cifique. N\u00e9cessite les droits correspondants.","type":"string"},"before":{"required":false,"description":"Limiter les r\u00e9ponses aux commentaires publi\u00e9s avant une date donn\u00e9e et conforme ISO8601.","type":"string"},"exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string"},"orderby":{"required":false,"default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"description":"Trier la collection par attribut d\u2019objet.","type":"string"},"parent":{"required":false,"default":[],"description":"Limiter le jeu de r\u00e9sultats aux commentaires ayant un ID parent sp\u00e9cifique.","type":"array","items":{"type":"integer"}},"parent_exclude":{"required":false,"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID parents sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"post":{"required":false,"default":[],"description":"Limite le jeu de r\u00e9sultats aux commentaires assign\u00e9s \u00e0 des ID de publications sp\u00e9cifiques.","type":"array","items":{"type":"integer"}},"status":{"required":false,"default":"approve","description":"Limiter le jeu de r\u00e9sultats aux commentaires assign\u00e9s \u00e0 un \u00e9tat sp\u00e9cifique. N\u00e9cessite les droits correspondants.","type":"string"},"type":{"required":false,"default":"comment","description":"Limite le jeu de r\u00e9sultats aux commentaires assign\u00e9s \u00e0 un type sp\u00e9cifique. N\u00e9cessite des droits sp\u00e9cifiques.","type":"string"},"password":{"required":false,"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string"}}},{"methods":["POST"],"args":{"author":{"required":false,"description":"L\u2019ID de l\u2019objet user, si l\u2019auteur \u00e9tait un utilisateur.","type":"integer"},"author_email":{"required":false,"description":"Adresse de messagerie pour l\u2019objet auteur.","type":"string"},"author_ip":{"required":false,"description":"Adresse IP de l\u2019auteur de l\u2019objet.","type":"string"},"author_name":{"required":false,"description":"Nom affich\u00e9 pour l\u2019objet auteur.","type":"string"},"author_url":{"required":false,"description":"URL pour l\u2019objet auteur.","type":"string"},"author_user_agent":{"required":false,"description":"Agent utilisateur pour l\u2019objet author.","type":"string"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"parent":{"required":false,"default":0,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"post":{"required":false,"default":0,"description":"L\u2019ID de l\u2019objet publication associ\u00e9.","type":"integer"},"status":{"required":false,"description":"\u00c9tat de l\u2019objet.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/comments"}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"password":{"required":false,"description":"Mot de passe de la publication parente du commentaire (si la publication est prot\u00e9g\u00e9e par un mot de passe).","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"author":{"required":false,"description":"L\u2019ID de l\u2019objet user, si l\u2019auteur \u00e9tait un utilisateur.","type":"integer"},"author_email":{"required":false,"description":"Adresse de messagerie pour l\u2019objet auteur.","type":"string"},"author_ip":{"required":false,"description":"Adresse IP de l\u2019auteur de l\u2019objet.","type":"string"},"author_name":{"required":false,"description":"Nom affich\u00e9 pour l\u2019objet auteur.","type":"string"},"author_url":{"required":false,"description":"URL pour l\u2019objet auteur.","type":"string"},"author_user_agent":{"required":false,"description":"Agent utilisateur pour l\u2019objet author.","type":"string"},"content":{"required":false,"description":"Le contenu pour cet objet.","type":"object"},"date":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string"},"date_gmt":{"required":false,"description":"La date \u00e0 laquelle l\u2019objet a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string"},"parent":{"required":false,"description":"L\u2019ID du parent de l\u2019objet.","type":"integer"},"post":{"required":false,"description":"L\u2019ID de l\u2019objet publication associ\u00e9.","type":"integer"},"status":{"required":false,"description":"\u00c9tat de l\u2019objet.","type":"string"},"meta":{"required":false,"description":"Champs m\u00e9tas.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Identifiant unique de l\u2019objet.","type":"integer"},"force":{"required":false,"default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","type":"boolean"},"password":{"required":false,"description":"Mot de passe de la publication parente du commentaire (si la publication est prot\u00e9g\u00e9e par un mot de passe).","type":"string"}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"type":{"required":false,"default":"post","enum":["post"],"description":"Limiter les r\u00e9sultats aux \u00e9l\u00e9ments d\u2019un type d\u2019objet.","type":"string"},"subtype":{"required":false,"default":"any","description":"Limiter les r\u00e9sultats aux \u00e9l\u00e9ments d\u2019un ou plusieurs sous-types d\u2019objet.","type":"array","items":{"enum":["post","page","any"],"type":"string"}}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/search"}},"\/wp\/v2\/block-renderer\/(?P<name>core\/block)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/block","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/latest-comments)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/latest-comments","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/business-hours)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/business-hours","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/contact-info)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/contact-info","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/address)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/address","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/email)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/email","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/phone)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/phone","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/gif)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/gif","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/mailchimp)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/mailchimp","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/map)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/map","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/repeat-visitor)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/repeat-visitor","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/slideshow)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/slideshow","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/tiled-gallery)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/tiled-gallery","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/contact-form)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/contact-form","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-text)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-text","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-name)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-name","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-email)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-email","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-url)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-url","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-date)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-date","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-telephone)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-telephone","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-textarea)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-textarea","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-checkbox)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-checkbox","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-checkbox-multiple)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-checkbox-multiple","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-radio)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-radio","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>jetpack\/field-select)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc jetpack\/field-select","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/archives)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/archives","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/categories)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/categories","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/latest-posts)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/latest-posts","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/shortcode)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/shortcode","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/video)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributs du bloc core\/video","type":"object"},"post_id":{"required":false,"description":"ID de ce contenu\/contexte.","type":"integer"}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"required":false,"description":"Titre du site.","type":"string"},"description":{"required":false,"description":"Slogan du site.","type":"string"},"url":{"required":false,"description":"URL du site.","type":"string"},"email":{"required":false,"description":"Cette adresse est utilis\u00e9e \u00e0 des fins d\u2019administration, comme les notifications d\u2019utilisateur.","type":"string"},"timezone":{"required":false,"description":"Une ville dans le m\u00eame fuseau horaire que le v\u00f4tre.","type":"string"},"date_format":{"required":false,"description":"Un format de date commun pour tous les r\u00e9glages de dates.","type":"string"},"time_format":{"required":false,"description":"Un format d\u2019heure commun pour tous les r\u00e9glages d\u2019heures.","type":"string"},"start_of_week":{"required":false,"description":"Le num\u00e9ro du jour de la semaine \u00e0 laquelle la semaine devrait commencer.","type":"integer"},"language":{"required":false,"description":"Code local de l\u2019installation WordPress.","type":"string"},"use_smilies":{"required":false,"description":"Convertir les \u00e9motic\u00f4nes, comme :-) et :-P, en images lors de l\u2019affichage.","type":"boolean"},"default_category":{"required":false,"description":"Cat\u00e9gorie d\u2019article par d\u00e9faut.","type":"integer"},"default_post_format":{"required":false,"description":"Format d\u2019article par d\u00e9faut.","type":"string"},"posts_per_page":{"required":false,"description":"Les pages de blog affichent au maximum.","type":"integer"},"default_ping_status":{"required":false,"enum":["open","closed"],"description":"Autoriser les liens de notification d\u2019autres blogs (pings et r\u00e9troliens) sur les nouveaux articles.","type":"string"},"default_comment_status":{"required":false,"enum":["open","closed"],"description":"Autoriser les lecteurs \u00e0 publier des commentaires sur les nouveaux articles.","type":"string"}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/settings"}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"description":"Le contexte dans lequel la requ\u00eate est faite ; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string"},"page":{"required":false,"default":1,"description":"Page courante dans la collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 renvoyer dans le groupe de r\u00e9sultats.","type":"integer"},"search":{"required":false,"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string"},"status":{"required":true,"description":"Limiter les r\u00e9sultats aux th\u00e8mes qui poss\u00e8dent un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["active"],"type":"string"}}}}],"_links":{"self":"http:\/\/www.gestiondeprojet.com\/blog\/wp-json\/wp\/v2\/themes"}}},"_links":{"help":[{"href":"http:\/\/v2.wp-api.org\/"}]}}